Beta. Everyone in Great Britain pays the same wholesale price for electricity, but it does not cost the same to supply every region. What electricity would cost in each region, updated daily, if each region paid its own constraint costs, carbon tax and subsidies.
Published

3 November 2026

Beta. This page is new and I'm still checking it. Loading… The code behind it is public on GitHub. If you spot a mistake, tell me or open an issue there.

The wholesale price now

Live

Fetching the latest price…

How this is worked out

This is Elexon's market index price for the latest half-hour: the price of electricity traded on the power exchange for delivery in that half-hour. I fetch it from Elexon every five minutes. Everyone in Great Britain pays it, wherever they are.

Carbon is the carbon tax included in it. I don't have a live figure for that, so I take its share of the wholesale price over the latest week I have complete figures for. Energy is the rest.

The true price now in each region

Partly estimated

Fetching the latest price…

The true wholesale price for Great Britain

The price on the power exchange covers only part of what a MWh costs. NESO's constraint and balancing costs, and the Contract for Difference and Renewables Obligation subsidies, are added to bills through separate charges. The first card adds them back in. It is every region's price averaged by how much electricity each region uses, so it is the same everywhere.

This is the price I would put in place of the wholesale price as the headline cost of electricity, because it is what a MWh actually costs the country before the wires, the supplier and VAT. In it averaged per MWh, against a wholesale price of . The other was paid outside the market.

The cards for each region share those same costs out between the regions. Across Great Britain they add up to the same total.

The zonal price now in each region

Estimated

Fetching the latest price…

How this is worked out

The true price above starts from the national wholesale price, which is the same in every region, and adds each region's costs. These cards start from each region's zonal price instead. They are a comparison with the true price, not part of it.

The zonal price is what electricity was worth in each region, worked out from the prices NESO paid generators there when a boundary was full. On the side with too much electricity, it is the lower of the wholesale price and the average price NESO paid generators there to reduce output. On the side with too little, it is the higher of the wholesale price and the average price NESO paid generators there to increase output. When no boundary is full, it is the wholesale price.

I don't add turn-down, turn-up or carbon, because the zonal price already has them in it. It is worked out from the prices NESO paid generators to turn down and turn up, so adding those payments on top would count them twice: under zonal pricing, the cost of a full boundary is the gap between the regions' prices. The carbon tax is in the price that gas power stations charge, so it is in the zonal price wherever gas sets it, as it is in the wholesale price. Where wind sets the price, as it often does in Scotland, there is no carbon tax in it. Some constraint costs would remain under zonal pricing, such as keeping the voltage steady in one area, and I leave those out too. Balancing, CfD and RO are the same as in the true price above, and follow the same setting for where the subsidies are charged.

Under real zonal pricing, the CfD would cost more where the zonal price is low, because it tops generators up to a fixed price, and generators would bid differently. I have left both out, so these figures show the size of the difference rather than a forecast.

NESO's payments are only complete up to the latest week I have figures for, so the zonal price for the latest half-hour isn't known yet. I estimate it from the half-hours of that week, split in two:

  1. When no boundary was full, a region's zonal price was the wholesale price. For that share of the time, I use the live wholesale price.
  2. When a boundary was full, the price was set by what NESO paid generators in the region, and that doesn't follow the wholesale price. For that share of the time, I use the average zonal price in those half-hours.

I count a half-hour as full for a region when its zonal price differs from the wholesale price. Each card says how often that happened and what electricity in the region was worth then. If the boundaries are fuller or emptier now than they were that week, the estimate will be out by that much.

Everyone in Great Britain pays the same wholesale price for electricity. It does not cost the same to supply every region, though, and the difference is paid by everyone equally.

What happened on 23 February 2025

On Sunday 23 February 2025 a strong wind blew across Scotland. The Scottish wind farms could generate far more electricity than the lines to England could carry, so NESO, which runs the grid, paid them to reduce their output. Moray East, an offshore wind farm in the Moray Firth, was paid £1.3 million to generate 20,800 MWh less. At the same time NESO paid gas power stations in the south of England to increase their output, to replace the electricity that could not reach them. Shoreham, in West Sussex, was paid £750,000 and Marchwood, near Southampton, £700,000. Altogether, NESO spent £24 million that day.

These payments are called constraint costs, because the grid constrains where electricity can go. In 2025 they came to about £2 billion, and they were added to every electricity bill in Great Britain equally, whether the customer was in the Highlands or in London.

How the grid is divided into regions

The transmission network connects each region to the next with a group of high-voltage lines. NESO calls each of these groups a boundary, and each boundary can only carry so much power. The four boundaries that are full most often, from north to south, are:

  • B4, between the north and the south of Scotland.
  • B6, between Scotland and England. This is the one that was full on 23 February, and the one that is full most often.
  • B7a, between the north of England and Yorkshire and the Midlands.
  • B9, between the Midlands and the south of England, including London.

These four boundaries divide Great Britain into the five regions used on the rest of this page. The map below shows them.

The power crossing each boundary today

Fetching NESO's forecast…

Each day NESO forecasts how much power will try to cross each boundary in every half-hour, and how much each boundary can carry. When the forecast flow is above the limit, NESO expects to pay wind farms north of the boundary to generate less and power stations south of it to generate more. Those payments are the constraint costs on the rest of this page.

Day

The forecast flow as a share of each boundary's limit, through the day

How this is worked out

The figures come from NESO's day-ahead constraint flows and limits. Your browser fetches them from NESO's open data portal when you open the page, and again each hour.

NESO makes the forecast the day before, from the wind forecast, the output generators have told it they plan to produce, and the demand forecast. It is the flow before NESO acts, so it can be far above the limit. NESO then pays generators to change their output until the real flow is under the limit. These are forecasts, not measured flows: the measured flows between regions come from metered output, which arrives about a week later, and are in "Transfers between regions" further down.

NESO's groups of lines do not match the four boundaries exactly. For each boundary I use the group that follows it most closely on NESO's network diagrams: SSE_SP2 for B4, SCOTEX for B6, SSHARN3 for B7a and FLOWSTH for B9. The table below lists every group NESO forecasts, with the four I use.

The coloured lines on the map are where the regions meet. Each region is made up of whole distribution network areas, so the lines only roughly follow the real boundaries. Arrows are wider for bigger flows and point the way the power is forecast to flow. Shetland is shown in the box. Times are UK time.

Every group of lines NESO forecasts, for the half-hour shown

Which region pays each cost

Subsidies and carbon tax are also shared equally across Great Britain. In 2025 Scotland used about 7% of Great Britain's electricity, but its generators received about 21% of the money paid under the Renewables Obligation, most of it to wind farms. Most of the gas power stations that pay carbon tax are in England. Yet every bill pays the same share of both.

In this analysis I charge each cost to the regions that cause it or use the electricity it pays for:

  • Constraint costs are charged to the regions where NESO paid the generators. When the lines from Scotland to England are full, the money paid to Scottish wind farms to generate less is a cost of Scotland, which had more electricity than the lines could carry away. The money paid to gas power stations in England to generate more is a cost of England.
  • Balancing costs are charged the same way. When NESO pays a gas power station in the south to generate more so that supply matches demand, that is a cost of the south. Payments for holding power in reserve and keeping the frequency steady can't be placed, so they are shared equally.
  • Carbon tax and the CfD and Renewables Obligation subsidies follow the electricity. A region pays them on the electricity it uses, wherever that electricity was generated. Much of the electricity from Scotland's wind farms is used in England, so England pays much of their subsidy.

The "Carbon tax and subsidies charged" setting below can instead charge carbon tax to the regions whose gas and coal power stations emitted the carbon, and subsidies to the regions where the subsidised generators are.

Region
Carbon tax and subsidies charged
Period

What electricity cost in , day by day

£ per MWh used (divide by 10 for pence per kWh). The coloured bands are the parts of the price and the line is the total.

How this is worked out

For every half-hour since February 2019, I add up seven parts:

  1. Energy: the wholesale price from Elexon, minus the carbon tax included in it.
  2. Carbon: the carbon tax included in the wholesale price. When a gas power station sets the price, part of that price is the carbon tax it pays, and every buyer pays it. I add this up for the whole country, then share it each day between regions in proportion to the carbon their gas and coal power stations emitted.
  3. Turn-down and Turn-up: NESO's constraint costs for that half-hour, for full lines and for keeping the voltage steady, split by what NESO paid generators to do. Turn-down is what it paid generators in the region to reduce their output, mostly wind farms where there was more electricity than the lines could carry. Turn-up is what it paid generators in the region to increase their output, mostly gas power stations where there was too little. A generator that pays NESO when it reduces its output, as a gas power station saving fuel does, lowers its region's turn-down cost by exactly what it paid. What NESO paid each generator comes from Elexon's settlement figures, which tie about half of NESO's constraint costs in 2025 to particular generators (between 30% and 85% in other years). The rest is NESO's trades, its contracts, and actions it did not mark as constraints. I share that by what NESO paid generators in each region in the same half-hour, for any reason, and split each region's share between turn-down and turn-up in proportion to what NESO paid its generators for each. Each region's cost is then spread over the electricity it uses. Together, turn-down and turn-up are the region's constraint costs.
  4. Balancing: NESO's other costs of running the system. Three kinds are charged to the regions whose generators NESO paid, in the same way as constraints: matching supply and demand from minute to minute, keeping enough spinning machines running to steady the system (inertia), and limiting how much power could be lost at once if one generator failed. NESO counts the last two as constraint costs, but they protect the whole country rather than relieve one boundary. NESO publishes them each day, and I move that day's share of its constraint costs into this part. In 2020, when demand fell during lockdown, they were more than a third of NESO's constraint costs; in 2025 they were about 2%. Holding power in reserve and keeping the frequency steady are paid for under contracts whose locations I don't have, so those costs are shared equally over every MWh used in Great Britain.
  5. CfD: the Contract for Difference payments made that day to generators in the region, divided by the electricity used there. Payments to small generators that Elexon does not meter, mostly solar farms, are shared by demand.
  6. RO: the Renewables Obligation's cost for the year, shared each day between regions in proportion to the RO support their generators earned. Ofgem has published figures up to March 2025, so after that I use the last year's figure.

Electricity used is what the transmission network delivered plus local solar and wind. I split it between regions using NESO's 2024 figures for peak demand in each area.

The page opens with carbon tax and subsidies following the electricity. Each region's carbon, CfD and RO are then shared between the regions that used its generators' electricity, as described under "Transfers between regions". With "where generated" picked instead, they stay with the regions where the power stations and wind farms are, so Scottish customers pay the subsidies of wind farms whose electricity is used in England. Either way, every pound is charged once across Great Britain.

I have left out network charges, supplier costs, VAT and the Capacity Market. Network charges do differ between regions, but they pay for the wires rather than for the electricity, so they belong on a different page.

Every region, month by month

£ per MWh. With alternative pricing switched on, it can also be shown here. The true price is the full cost from the chart above. Its energy part is the national wholesale price, the same in every region. The zonal price is a separate comparison and is not part of the true price. It is what electricity would have been worth in each region if the market priced the boundaries, worked out from what NESO paid generators there.

Show
How this is worked out

True price: the six parts above, averaged over each month.

Zonal price: when a boundary is full, electricity on the generating side of it is worth less and electricity on the other side is worth more. NESO's payments show how much:

  1. On the generating side, I take whichever is lower: the wholesale price, or the average price NESO paid generators there to reduce output. Wind farms lose their subsidy when they reduce output, so they ask to be paid, and this price is often below zero.
  2. On the other side, I take whichever is higher: the wholesale price, or the average price NESO paid generators there to increase output.
  3. When no boundary is full, every region has the wholesale price.

These are prices NESO actually paid. Under real zonal pricing, generators would bid differently and new ones would be built in different places, so these figures show the size of the difference rather than a forecast.

Each region's price over time:

£ per MWh. Pick how long each point on the chart covers. Half-hours and hours are shown a month at a time and days a year at a time: pick a year and month, or step through them. Weeks and months show the whole history.

Each point is
Year
Show

How this is worked out

This chart uses the same figures as the charts above. Each point for an hour, a week or a month is the average of the half-hours or days in it. Weeks start on Monday. When I average a region's days into weeks, I give each day more weight the more electricity the region used that day. The zonal price is described under "Every region, month by month". It is a separate comparison and is not part of the true price. When it is shown and a region's line is on the wholesale price, no boundary was full or NESO made no payments there.

The months up to September 2026 are stored with the page. The months since then come from the nightly update, which ends a few days before today because NESO publishes its balancing costs a few days after the event.

What a MWh generated in each region costs

£ per MWh generated, by where the generator is. Scottish wind farms receive subsidies on top of the wholesale price, and they are also paid to reduce output when the B6 boundary is full, so each MWh they do generate costs more.

Year
How this is worked out

For every generator Elexon meters, I add up what it was paid and divide by the electricity it generated:

  1. Energy and carbon: what the market paid for the electricity it sold, split by that day's share of carbon tax in the price. A generator that NESO paid to reduce output had already sold that electricity, so this can be more than the wholesale price per MWh generated.
  2. Balancing: what NESO paid it to increase or reduce output, less anything it paid back.
  3. CfD: its Contract for Difference payments, from the Low Carbon Contracts Company.
  4. RO: an estimate of its Renewables Obligation support: Ofgem's certificates per MWh for its technology, multiplied by that year's certificate value.

The ◆ adds the cost of the electricity NESO bought elsewhere to replace output it paid generators here to reduce. This is an estimate, and the same money is already counted in the region of the generator that replaced it.

Each generator is placed using the distribution network area Elexon gives it, or otherwise its location in the government's list of power stations (DUKES 5.11). Offshore wind farms are placed where their cable comes ashore. Small solar and wind farms that Elexon does not meter are not included.

By distribution network area

For the year picked above. The price of a MWh used is the same throughout a region, because I calculate it region by region. The cost of a MWh generated differs from area to area.

How this is worked out

Elexon settles the electricity market in 14 areas, one for each distribution network operator's licence area. Elexon calls these GSP groups. Each area's share of demand comes from NESO's 2024 figures for peak demand. The cost of a MWh generated is worked out as in the chart above, for the generators in that area.

What time of day constraint costs occur

The share of each year's constraint costs that falls in each hour, UK time. I suspect smart tariffs are moving electric car and battery charging into hours when the boundaries are already full. If so, those hours should take a growing share.

How this is worked out

I add up NESO's constraint costs for each hour of the day and divide by the year's total. Using shares means years with very different totals can be compared on one chart; the tooltip gives the amounts in pounds. A shift towards cheap overnight or midday hours would be consistent with charging that follows the national price. It would not prove it, because wind output and power station outages also vary by hour.

Who receives constraint payments in

From February 2019 to the latest figures: what NESO paid each generator to increase or reduce output because a boundary was full. Gas power stations that NESO asks to reduce output pay a little back, because they save on fuel.

How this is worked out

This comes from Elexon's record of what NESO paid each generator. I count only the payments NESO marked as being for system reasons, such as a full boundary, and not those for matching supply and demand. Owners come from my register of who owns each generator.

How often each boundary was full

Each cell gives the number of half-hours that boundary was full, and NESO's constraint costs in those half-hours.

How this is worked out

For each half-hour, I look at where NESO paid generators to reduce output and where it paid them to increase output. The boundary that was full is the one with reductions on its north side and increases on its south side. "None" means NESO's payments did not show electricity held back in the north, for example when it paid a power station to run to keep the voltage up in one area. My regions are made of whole distribution network areas, so they only roughly follow the real boundaries.

Transfers between regions

Net transfer south across each boundary, TWh a year. These transfers are what the "where used" setting follows.

Each region's generation and use, and its carbon tax, RO and CfD per MWh used, charged where generated and where used.

How this is worked out

For each half-hour I take the metered output of every generator in each region and each region's electricity use. Imports and small generators that Elexon does not meter are counted as local supply in each region, in proportion to its use. Output that NESO paid generators not to produce is not counted, because it was never generated, so only real transfers are traced.

The transfer across each boundary is what the regions north of it generated beyond their own use. Then I trace the electricity using a method called proportional sharing:

  1. A region uses a mix of its own generation and the electricity it imports from its neighbour, in proportion to how much of each it has.
  2. It passes the same mix on to the next region.
  3. So each region's use is made up of known shares of every region's generation.

With "where used" selected, each day's carbon tax, RO and CfD for a region's generators are shared between the regions in proportion to how much of those generators' output each region used. All of a region's generators send their electricity the same way, so the carbon tax of its gas power stations is shared in the same proportions as the subsidies of its wind farms. Constraint costs are not traced. They stay with the regions on the short side of the boundary that was full.

Grid upgrades: what each new link would change

What constraint costs would have been in each year since 2019 if the link had been running. The table shows , the latest full year.

Link

Other planned reinforcements, in the order they are due. NESO does not publish how much extra electricity each of these lets cross a boundary, so I have left them out of the figures above.

How this is worked out

Each link connects two regions with a fixed capacity. For each half-hour since February 2019:

  1. I find the boundary that was full, and how much electricity NESO paid generators behind it to hold back.
  2. If the link runs past that boundary, it carries up to its capacity of that electricity. A 2,000 MW link carries up to 1,000 MWh in a half-hour.
  3. NESO's constraint costs for the half-hour fall in proportion to the electricity the link carried, and the zonal prices move towards the wholesale price by the same share.

These figures show what would have happened in past years. They are not a forecast, and they probably overstate the savings:

  • Once one boundary has room, the next boundary to the south may become full instead. I do not model that.
  • More wind farms will have been built by the time each link opens, and they will fill some of the new capacity. The next section adds them.
  • The extra electricity would also lower the wholesale price a little, which is left out.

The links, their routes and their planned years come from the developers' published project pages (SP Energy Networks, SSEN Transmission and National Grid) and from NESO's Clean Power 2030 plan and its Beyond 2030 Update of August 2026. The years after 2035 are NESO's probable delivery dates and are likely to move. Each choice of "every link due by" a year includes every link due in or before that year. The latest year (*) is not complete.

Future wind farms: what constraint costs could become

£ million a year. Each year takes the weather and electricity use of and adds the wind farms due to be running by then. Pick which wind farms to include.

These figures do not include any growth in electricity use. Demand stays at 's level, so the extra electricity heat pumps, electric cars and data centres will use is left out. More of the new wind would be used near where it is generated, so the real constraint costs are likely to be lower than these.

Wind farms
Year
The wind farms included
How this is worked out

I take every half-hour of and add the wind farms due by each year:

  1. Each region's new wind farms are assumed to generate in the same pattern as the wind farms already metered there. If a region's wind capacity doubles, its wind output each half-hour doubles.
  2. The extra electricity travels south towards the gas power stations it replaces. Working from the north of Scotland south, each boundary carries what fits under its limit. The limit is the most electricity my figures show crossing that boundary in , leaving out the highest 5% of half-hours.
  3. When a boundary was already full, all the extra electricity behind it is held back. A 2,000 MW link carries up to 1,000 MWh each half-hour.
  4. NESO pays the average for each MWh held back when a boundary was full, per MWh. The cost is shared between the regions as it was in when that boundary was full: by what NESO paid the generators in each region to reduce or increase their output. Costs in half-hours when no boundary was full, mostly for keeping the voltage steady, stay as they were in .

With no new wind farms and no links, this gives 's actual constraint costs.

The links can raise the South's costs. They carry more of Scotland's wind as far as the Midlands, and the boundary between the Midlands and the south of England then fills up more often. None of the links planned before 2033 crosses that boundary.

The figures are rough. Three things they leave out would lower them:

  • Electricity use is held at 's level. Heat pumps and electric cars will raise it, so more of the new wind would be used near where it is generated.
  • Batteries would store some of the electricity that is held back.
  • The other planned grid reinforcements, listed under "Grid upgrades", are not included, because NESO does not publish how much each adds.

One thing they leave out would raise them: with so much more wind, NESO may have to pay more for each MWh it holds back than it did in .

The wind farms with a CfD contract come from the Low Carbon Contracts Company's register: every allocation round so far, each phase at its expected start date, placed by its site's postcode. Wind farms that were already generating in are left out, because their output is already in that year's figures. The results of allocation round 8 are not out yet; they will be added when the register lists them. The ScotWind projects and their connection dates come from NESO's register of contracted connections (the TEC register). Several connect directly into England, so they are counted in the English region where they connect. Dates already past count as the following year.

When the Renewables Obligation ends

£ per MWh used, charged where the electricity is generated, at 's output, use and certificate prices. The Renewables Obligation closed to new generators in 2017, and it pays nothing after 31 March 2037.

What should happen when the support ends. The generators are already asking for something to replace it. The government has given Drax a new Contract for Difference from 1 April 2027, the day after its Renewables Obligation support ends, until March 2031, at £109.90 per MWh in 2012 prices. The government says that halves Drax's subsidy, but it is still a new subsidy for a power station whose support has run its course. Owners of older wind farms are asking for help to keep their turbines running or to rebuild them.

I think replacing the support is absurd. These generators were promised payments on top of the wholesale price for up to 20 years, and they have had them. That was the deal, and it is ending as agreed. A wind farm that still pays its way on the wholesale price should carry on. One that can't should be allowed to fail. If it goes into administration, the state should buy it from the administrators at whatever it is then worth, rather than rescue it with new subsidies. The public would then own the site and its grid connection, one of the hardest things for a new project to get, and could rebuild it or sell it on.

The largest stations and when their support ends
How this is worked out

The rules are in article 44 of the Renewables Obligation Order 2015. A station first accredited on or before 25 June 2008 gets no certificates after 31 March 2027. A station accredited later gets them for 20 years, but none from 31 March 2037, when the scheme closes. Capacity added to a station later gets its own 20 years.

  1. For each generator Elexon meters, I take its Renewables Obligation support in and the date it started. The government's list of power stations (DUKES 5.11) gives only the year, so I take the middle of it. For the large stations DUKES does not cover, I use the date the government's Renewable Energy Planning Database gives for when each began operating.
  2. Drax is the largest. Its units were converted to burn only biomass between 2013 and 2018, but Drax was first accredited for burning biomass with coal before 2008, so its support ends on 31 March 2027.
  3. Each year, a region's figure is its figure multiplied by the share of its generators' support still being paid.

I treat each station as one block. Extensions accredited later keep their support for longer, so for stations that were extended the fall comes a little too early. Small generators that Elexon does not meter are assumed to drop out at the same pace as the metered ones in their region. Prices stay at 's. In reality the certificate price rises with inflation each year.

The figures, year by year

Sources

  • Wholesale prices, and what NESO paid each generator: Elexon.
  • NESO's daily balancing costs, and local solar and wind output: the NESO Data Portal.
  • Contract for Difference payments: the Low Carbon Contracts Company. Renewables Obligation: Ofgem's annual report.
  • When Renewables Obligation support ends: the Renewables Obligation Order 2015, article 44; start dates from DUKES 5.11 and the Renewable Energy Planning Database. Drax's contract from 2027: Drax Group's announcement to the London Stock Exchange.
  • Carbon prices: a yearly average of the UK and EU emissions trading scheme prices, plus Carbon Price Support. The government has not yet published a figure for 2026, so 2026 uses 2025's.
  • Power station locations: DUKES table 5.11. Distribution network area maps and demand: the NESO Data Portal.
  • Boundary flows and limits: NESO's day-ahead constraint flows and limits, from the NESO Data Portal.
  • The code is the regional step of my gb-power-prices project, which is public on GitHub at github.com/Miteas/gb-power-prices under the MIT licence. It holds the whole pipeline, from downloading the data to the figures on this page, so you can check every step or run it yourself. For the wider picture, see my GB electricity cost explorer.